Broadstairs Weather |
|
|
The picture below shows atypical well head. This one is being modified, when it was built all the cables for the telemetry, Electricity & Flow meters came in the bottom, These are now being moved so they enter near the top. Concrete is being put in the trench to stop surface water from entering the well. The picture below shows inside the well head The pump is suspended under the pipe work in another chamber The next picture shows the well with pump removed you will notice the second chamber below the well head
the next image shows the well pump being removed from the well the pump is attached to the well head with 4.5 metres of wellmaster pipe
|